Photographs- December 2014 Update

 
Auger Drilling 01
Auger Drilling 01

Auger drilling program in Tandawa East

Auger Drilling 02
Auger Drilling 02

Auger drilling program in Tandawa West showing the national highway at the background.

Auger Drilling 04
Auger Drilling 04

Auger drilling program in Tandawa West

Auger Drilling 01
Auger Drilling 01

Auger drilling program in Tandawa East

Auger Drilling Program


Photographs showing the auger drilling program within the thick nickel laterite deposits in the Tandawa East and West areas inside the CMDC-CCILMMRC license area.

Auger Sample
Auger Sample

Collected auger sample every 1 meter interval.

Auger Samples
Auger Samples

Collected auger sample every 1 meter interval..

Auger Drill hole station
Auger Drill hole station

Numbered Flagging Tape- location of the aguer drill hole

Auger Sample
Auger Sample

Collected auger sample every 1 meter interval.

AUger Sampling


Sampling of the auger drilling program were conducted every 1 meter intervals. 

Pre-Shipment Inspection (PSI)
Pre-Shipment Inspection (PSI)

Auger drilling was utilized to collect samples from the stockpiles.

Pre-Shipment Inspection (PSI)
Pre-Shipment Inspection (PSI)

Auger sampling over the stockpiles.

Pre-Shipment Inspection (PSI)
Pre-Shipment Inspection (PSI)

Final samples collected for analysis

Pre-Shipment Inspection (PSI)
Pre-Shipment Inspection (PSI)

Auger drilling was utilized to collect samples from the stockpiles.

Pre-Shipment Inspection (PSI) Pics


Photographs showing the technical staff of CCIC and Intertek conducting the PSI of the residual stockpiles in Claver Mines.